Landis+Gyr E470 User Manual page 30

Tokenless smart prepayment meter
Hide thumbs Also See for E470:
Table of Contents

Advertisement

Page 30 of 69
© Landis+Gyr
Issue: 1.8
Monthly Read – A snapshot of registers taken between 00:00 and
02:00 on the first day of each calendar month and transferred to
the system.
Billing Period Read - A snapshot of registers is taken between
00:00 and 02:00 at the end of a billing period, as defined in the
billing period section, and transferred to the system.
The meter may be configured not to send scheduled reads.
The meter will additionally store the last sent scheduled read as a
contingency in case of communication failures.
Commands and meter data
E470 Tokenless Smart Prepayment Meter

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents