Panasonic PT-RQ25K Series Operating Instructions (Functional Manual) page 301

Table of Contents

Advertisement

Chapter 6 Maintenance — Light source/temperature indicators
Temperature indicator <TEMP>
Indicator status
f Warm-up status
Lighting red
f Internal temperature is high
(warning).
Blinking red
f Internal temperature is high (standby
(2 times)
status).
Blinking red
f The cooling fan has stopped.
(3 times)
*1 The operating environment temperature should be between 0 °C (32 °F) and 40 °C (104 °F) if the projector is used at an altitude between 1 400 m
(4 593') and 4 200 m (13 780') above sea level.
Note
f If the temperature indicator <TEMP> is still lit or blinking after taking the measures, ask your dealer for repair.
Status
f Wait five minutes when the power is turned on while the temperature is low
(approximately 0 °C (32 °F)).
f Install the projector in a location with the operating environment temperature
between 0 °C (32 °F) and 45 °C (113 °F)
f Remove any objects if they are blocking the intake/exhaust vents.
f Install the projector in a location with the operating environment temperature
between 0 °C (32 °F) and 45 °C (113 °F)
10 % and 80 % (no condensation).
f Turn the <MAIN POWER> switch to <OFF> (x page 83), and consult
your dealer.
Solution
.
*1
, and ambient humidity between
*1
ENGLISH - 301

Advertisement

Table of Contents
loading

Table of Contents