Maintenance - M&C PSS Series Instruction Manual

Portable gas conditioning unit
Hide thumbs Also See for PSS Series:
Table of Contents

Advertisement

15

MAINTENANCE

Before the maintenance work is carried out, it is necessary that the specific safety procedures pertaining to the
system and operational process be observed!
W A R N I N G !
The frequency of the maintenance work depends on the operational process and can therefore only be
determined in each individual case. Maintenance instructions pertaining to individual components can be found
in the instruction manual for individual components.
All parts which might require maintenance work are easily accessible housed in the gas conditioning system. The
following parts might require maintenance work:
 The filter element of the preliminary filter FP-2T.
N O T E !
 The preliminary filter for the peristaltic pump PF2. If the condensate contains particle residue, the preliminary
filter should be replaced at regular intervals. The 'one-way' filter is situated in the suction side of the pump
hose and can be easily replaced;
 Hoses of the condensate pump SR25.1. These should be checked every six months and, if necessary,
replaced (consult the instruction manual in the Appendix);
 Diaphragm of the sample gas pump N9KPE. These should be checked every six months and, if necessary,
replaced;
www.mc-techgroup.com
Dangerous voltage!
It is necessary to take the equipment off the mains before any assembly,
maintenance or repair work is carried out.
In order to protect downstream analyzers, the wet filter element must
always be replaced in the event of a condensate breakthrough.
PSS-10 | 1.00.02
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pss-10/1

Table of Contents