Figure 4 Connecting Heated Sample Line With Special Adapter (Option) - M&C PSS Series Instruction Manual

Portable gas conditioning unit
Hide thumbs Also See for PSS Series:
Table of Contents

Advertisement

C o n n e c t i n g t h e h e a t e d s a m p l e l i n e w i t h s p e c i a l a d a p t e r
Sample gas IN
Bulkhead union
Back ferrule 6 mm Øi
PSS...
Support sleeve
4 mm Ø OD
Figure 4
Connecting heated sample line with special adapter (option)
The heated line is connected to the gas conditioning with the connection adapter (Part No. 01G9060) as
follows:
1. Place the special adapter (Part No. 01G9060) on the PTFE tube according to the drawing seen above;
2. Place the support sleeve into the PTFE tube;
3. Insert the PTFE tube as far as it will go into the 'Sample Gas IN' bulkhead fitting and hand-tighten the
adapter;
4. Tighten the adapter 1 1/4 turns with a wrench (SW 14), while holding the lock nut of the bulkhead
connection with a wrench (SW 15);
5. Insert the 10 mm tube of the heating line into the adapter as far as it will go and hand-tighten it with the
union nut;
6. Tighten union nut with wrench (SW 19) 1 1/4 turns; hold adapter with wrench against.
The screw connection is now cut gas-tight and can be loosened as often as required.
24
Adapter
Sealing ring
Sealing ring
6 mm Øi
10 mm Øi
PSS-10 | 1.00.02
Union nut 10 mm Øi
Back ferrule
10 mm Øi
www.mc-techgroup.com
Heated sample line

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pss-10/1

Table of Contents