Time Electronics
5068 Insulation Tester Calibrator
5.2
Typical Operation Procedure
5.2.1
Initial Setup
1) Check the battery on both 5068 V/I Meter and Insulation Tester.
Make sure their batteries are fully charged.
2) Complete the setup procedure for the insulation tester (UUT).
3) Connect the selected test leads to the 4 mm recessed sockets of the 5068.
NOTE: If the UUT's own test leads are available, use them as first choice.
9
User Manual
Need help?
Do you have a question about the InsCal 5068 and is the answer not in the manual?