Expo Technologies Minipurge ® System With Etimer (Optional) Preventive Maintenance Schedule - Ametek IPS-4 User Manual

Dual bench (uv / ir) analyzer zone 1 / division 2
Hide thumbs Also See for IPS-4:
Table of Contents

Advertisement

5-6 | IPS-4 Dual Bench (UV / IR) Analyzer
Frequency
Task
Every Six Months
Sheltered Systems
If your analyzer system is installed in a custom shelter, check the
air filters for the shelter purge and air conditioning systems and
replace them if necessary. Depending on the location of the site
and its environmental conditions, it may be necessary to check and
replace these filters more frequently.
Every Six Months
Sample/Vent Lines
Inspect the Sample Line and Vent Line for sags, sharp bends, or
damage to the outer skin. If necessary, take appropriate safety pre-
cautions and replace the lines. Perform a leak check on all associ-
ated fittings after replacing any line(s).
Measuring Cell
Every Year
Clean the Measuring Cell and the rest of the analyzer sample sys-
tem. This schedule is a minimum requirement. If other conditions
are found to be present, as outlined in this chapter under "Measur-
ing Cell Preventive Maintenance," cleaning may be required more
frequently.
At the same time, replace the o-rings (always) and windows and/or
window/mirror combinations (if chipped, cracked, or scratched).
3–5 Years
Xenon Flash Lamp Assembly
Replace the Xenon Flash Lamp Assembly. The assembly may need
to be replaced sooner if information from the analyzer diagnostics
indicates related alarms. Refer to "Replacing the Xenon (UV) Flash
Lamp Assembly" in this chapter.
Infrared Source Assembly
3–5 Years
Replace the Infrared Source Assembly. The assembly may need to
be replaced sooner if information from the analyzer diagnostics indi-
cates related alarms.
Assembly" in this chapter.
Expo Technologies MiniPurge
Preventive Maintenance Schedule
Frequency
Task
If your analyzer uses an Expo Technologies MiniPurge
With eTimer, refer to the system's manual for maintenance frequen-
cy and procedures. This manual is shipped with the analyzer.
To test the pressure of the Electronics Enclosure, use the Cabinet
Pressure Port on the Solenoid Block.
3 Years
Battery Pack, Expo MiniPurge
Replace the Battery Pack and perform the commissioning tests as de-
scribed in the Expo MiniPurge
See "Expo Technologies MiniPurge
Parts" in Chapter 6 for spare parts ordering information.
Refer to "Replacing the Infrared (IR) Source
System With eTimer (Optional)
®
System (if analyzer is equipped)
®
Type X / ET Size 1 Manual (ML 422).
®
System With eTimer Spare
®
System
®

Advertisement

Table of Contents
loading

Table of Contents