Section 4 Operation; Configure The Particle Counter; Configuration Setup - Hach Met One 6000 Series User Manual

Table of Contents

Advertisement

Section 4

4.1 Configure the particle counter

4.1.1 Configuration setup

1
RS232 COM port on PC
2
Service port on the particle counter
Operation
Each particle counter must be configured before operation for parameters such as
sample time and count alarm thresholds.
A setup utility program is used to configure parameters that are stored in the particle
counter. When power is applied, the counter will look for a new configuration. If a new
configuration is not found, the previously saved configuration will be used.
Each particle counter must be connected to a PC for configuration.
Prerequisites
Service port cable, 8-pin DIN to 9-pin serial connector
Met One 6000 setup utility program—requires PC with Windows
®
or Windows
XP Professional and one RS232 port. If an RS232 port is not available,
a USB to RS232 adapter can be used.
Setup
1. Make sure that Microsoft .Net Framework is installed on the PC. If not installed, open
the dotnetfx.exe file on the utility program CD to install the application.
Note: The user must be logged on to the PC as an Administrator.
2. Copy and paste the SetupUtility.exe file from the utility program CD to the PC.
3. Connect the particle counter to the PC as shown in
4. Start the utility program to configure the instrument
Figure 20 Particle counter connection to PC
Figure
(section 4.1.2 on page
3
Cable, service port (8-pin DIN to 9-pin serial)
(section 7.1 on page
47)
®
2000 Professional
20.
30).
29

Advertisement

Table of Contents
loading

Table of Contents