The sample probe must be installed correctly to prevent contamination of the counter and
to get a representative sample of the area.
The following optional kits are available for installing the sampling probe. Refer to
Figure 9
and
Parts and accessories on page 47
Direct mount—the probe is installed on a short piece of tubing directly on top of the
counter
(Figure
6). Use this probe when the particle counter can be located where the
sample is collected. Use the direct mount probe to keep particle loss to a minimum.
T-type wall bracket—the probe is installed in a wall bracket. The tubing is cut to
connect the probe to the counter.
Vertical wall mount—the probe is connected to a stainless steel tube and bracket. Use
this probe for installation on equipment with stainless steel tubing. The probe can be
located where the sample is collected.
Through-wall mount—the probe is connected to a stainless steel tube and wall
bracket. Use this probe to collect samples on the other side of a wall from the counter.
Ceiling mount—the probe is connected to a stainless steel tube (J-hook or 90 degree)
and ceiling bracket. Use this probe to collect samples in the middle of a room or when
the particle counter is installed above the room.
Figure 9 Probe mount options
for order information.