Powering Up And Shutting Down The System; Power Up The System; Shut Down The System; Hard Shutdown - Bayer HealthCare CERTEGRA MEDRAD Stellant FLEX Operation Manual

Ct injection system
Table of Contents

Advertisement

Operation Manual
7

Powering Up and Shutting Down the System

7.1 Power Up the System

CAUTION
Electric Shock Hazard - Minor or moderate patient and/or worker injury may result.
Verify the voltage and frequency as labeled matches the voltage and frequency of the electrical
outlet.
1.
Press the Power button on the workstation. The injector and the workstation power up.
2.
Read the warnings, and press Continue. The Home screen displays.

7.2 Shut Down the System

The system provides two options for shutting down the system: Full System Shutdown and Injector Shutdown.
1.
From the Launch menu, select a Shutdown option or press Power button on workstation.
2.
Select from the following (Figure 7 - 1: Shutdown Options):
System Shutdown: Both the workstation and injector shut down.
Injector Shutdown: The injector shuts down, the display screen is blank, and Informatics operations
remain running on the display.

7.2.1 Hard Shutdown

To perform a hard shutdown, either:
Press and hold the Power button on the Workstation or Workstation with Pod.
Turn the power switch to Off on the Workstation with Pod (in the event that the graphical display is
unresponsive).
Unplug the power cord to the Workstation or Workstation with Pod (in the event that the graphical display
is unresponsive).

7.3 Restore from Injector Shutdown

When the system is in Injector Shutdown mode, the injector is shut down, the display screen is blank, and the
Informatics operations remain running in the background.
1.
Press the Power button on the workstation. The injector powers up, and the display screen becomes active.
2.
Read the warning, and press Continue. The Home screen displays.
Figure 7 - 1: Shutdown Options
7 - 29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents