Base Unit Connections; Base Unit Input Power Requirements - Bayer HealthCare CERTEGRA MEDRAD Stellant FLEX Operation Manual

Ct injection system
Table of Contents

Advertisement

17 - 92

17.3.2 Base Unit Connections

1
Equipotential connection
4
Service connection (J112)
7
Injector head connection (J113)

17.3.3 Base Unit Input Power Requirements

NOTE: Base unit input power requirements apply to the system as the system receives its power through
the base unit.
100-240 VAC
50-60 Hz
300 VA
MEDRAD® Stellant FLEX CT Injection System with Certegra® Workstation
2
Power connection
5
Future use (P115)
3
Injector head cable clamp
6
Workstation connection (P108)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents