Section 2-Pre-Operation And Inspection; Preparation, Inspection And Maintenance - JLG 642 Operation & Safety Manual

Hide thumbs Also See for 642:
Table of Contents

Advertisement

SECTION 2—PRE-OPERATION AND INSPECTION
2.1

PREPARATION, INSPECTION AND MAINTENANCE

The following table covers the periodic machine inspections and maintenance required.
Consult local regulations for further requirements for telehandlers. The frequency of
inspections and maintenance must be increased as necessary when the machine is used
in a harsh or hostile environment, if the machine is used with increased frequency, or if
the machine is used in a severe manner.
Type
Pre-Operation
work shift or at each
Inspection
change of operator.
Pre-Delivery
Inspection
(see note)
Preventative
Service Manual and/
Maintenance
or the Maintenance
Charts located on the
Note: Inspection forms are available.
31211031
Inspection and Maintenance
Frequency
Beginning of each
Before each sale,
lease or rental
delivery.
At intervals as
specified in the
machine.
Section 2—Pre-Operation and Inspection
Primary
Responsibility
User or
Operator
Owner, Dealer
or User
Owner, Dealer
or User
Service
Qualification
User or
Operation &
Operator
Safety Manual
Service Manual
Qualified
and applicable
Mechanic
Inspection form.
Service Manual
Qualified
Mechanic
Maintenance
Reference
and
Charts
2-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

943104310551255

Table of Contents