Install Stator And Wiring Harness; Install Pipe Plug Or Fitting And Pulse Line For Fuel Pump - Kohler Courage SV470 Service Manual

Vertical crankshaft
Hide thumbs Also See for Courage SV470:
Table of Contents

Advertisement

Section 10
Reassembly

Install Stator and Wiring Harness

Install Stator
1. Position the stator onto the mounting bosses so
that the leads lay in the channel and recess of the
captured when the blower housing is installed.
If a clamp was used to retain the leads, remove
and install the clamp. Hold the clamp in position
and torque the screw to 24.5 N·m (216 in. lb.)
stator and torque to 6.0 N·m (55 in. lb.), into new,
4.0 N·m (35 in. lb.), into used
holes.
Figure 10-47. Installing Stator.
Install Wiring Harness
violet B+ wiring harness lead is angled upward.
Insert the terminal into the center location of the
leads from the stator go in the outer locations.
10.14
Figure 10-48. Installing B+ Lead into Connector.
Install Pipe Plug or Fitting and Pulse Line
for Fuel Pump
1. Apply
tapped vacuum port of the closure plate. Torque
the plug to 4.5-5.0 N·m (40-45 in. lb.). Turn the
Channel
Recess
Figure 10-49. Connecting Pulse Line to Fitting.
®
®
(Loctite
No.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents