Install Stator And Wiring Harness; Installing B+Lead Into Connector; Install Pipe Plug Or Fitting And Pulse Line For Fuel Pump; Connecting Pulse Line To Fitting - Kohler Courage SV470-600 Service Manual

Vertical crankshaft courage series
Table of Contents

Advertisement

Section 10
Reassembly
3. Torque the valve cover screws to 11.0 N·m
(95 in. lb.) into new, as-cast holes, or 7.5 N·m
(65 in. lb.) into used holes, using the sequence
shown in Figure 10-41.
6
3
4
Figure 10-41. Valve Cover Torque Fastener
Sequence.

Install Stator and Wiring Harness

Install Stator
1. Position the stator onto the mounting bosses so
that the leads lay in the channel and recess of the
closure plate. See Figure 10-42. They will become
captured when the blower housing is installed.
2. Install the two hex. flange screws to secure the
stator and torque to 6.0 N·m (55 in. lb.), into new,
as-cast holes, or 4.0 N·m (35 in. lb.), into used
holes.
Figure 10-42. Installing Stator.
10.12
www.SmallEngineDiscount.com
7
1
5
2
Channel
Recess
Not For Resale
Install Wiring Harness
1. Check that the locking tang on the terminal of the
violet B+ wiring harness lead is angled upward.
Insert the terminal into the center location of the
rectifier-regulator plug connector until it locks into
place. If not already inserted, the two AC leads
from the stator go in the outer locations. See
Figure 10-43.
Figure 10-43. Installing B+ Lead into Connector.
Install Pipe Plug or Fitting and Pulse Line
for Fuel Pump
1. Apply pipe sealant with Teflon
59241 or equivalent), to the 1/8" pipe plug or 90°
fitting (as equipped). Install and tighten into the
tapped vacuum port of the closure plate. Torque
the plug to 4.5-5.0 N·m (40-45 in. lb.). Turn the
outlet of a fitting to the 8 o'clock position.
2. If a fitting is used, connect the fuel pump pulse
line and secure with the clamp. See Figure 10-44.
Pulse Line
Figure 10-44. Connecting Pulse Line to Fitting.
®
(Loctite
®
No.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents