Inserting Alignment Pin; Installing Carburetor Assembly With Linkages; Securing Ground Lead; Fuel Solenoid Lead Secured With Tie Strap - Kohler Courage SV470 Service Manual

Vertical crankshaft
Hide thumbs Also See for Courage SV470:
Table of Contents

Advertisement

Section 10
Reassembly
4. Models with one screw and one mounting stud
only: Insert a 3/16" diameter rod, approximately
4" long, into the open mounting hole in the heat
damage the threads.
Temporary Alignment Pin
Figure 10-59. Inserting Alignment Pin.
5. Install a new carburetor gasket onto the
carburetor and install the carburetor assembly.
with the lever up.
Figure 10-60. Installing Carburetor Assembly with
Linkages.
10.18
Throttle Linkage
Choke Linkage
7. If the carburetor has a fuel solenoid, fasten the
ground lead to the crankcase boss, with the
toothed washer between the eyelet terminal and
8.0 N·m (70 in. lb.)
lead to the wiring harness and secure with a tie
Ground Lead
Figure 10-61. Securing Ground Lead.
Figure 10-62. Fuel Solenoid Lead Secured with Tie
Strap.
Figure 10-63. Connecting Fuel Line to Carburetor.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents