Vatech Green 21 PCT-90LH User Manual page 43

Table of Contents

Advertisement

2.
Tighten two bolts on the rear side as shown in the following figures.
Wrench Bolt
3.
Connect the cables to the rear side of the Handle Frame referring to
Green21 (Model: PCT-90LH) Installation Manual
Part No.: 26
w/spring
Size: M10 x 30
Qty.: 2 ea
Figure 4-16. Tightening two bolts on the rear side
4. Installation Procedures
Section 0.
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents