Vatech Green 21 PCT-90LH User Manual page 118

Table of Contents

Advertisement

Appendix
5.
While installing the equipment
Were the installers careful with any sensitive parts
during the installation (including transfer)?
Did installers make sure that various cables,
especially optic cable, are not coiled too much?
Did the installers perform installation according to the
manual?
Did installer make sure harness and equipment are
well connected and not damaged?
Was the equipment well balanced?
6.
After installation
Is the equipment ready for normal customer
operation?
Has the installation area been cleaned up after
installation?
Is it OK after visually checking the equipment?
Does the equipment supply the power normally?
Has the Chinrest been successfully initialized after
turning on the system?
Are cables well-organized?
Is the normal voice message audible during system
initialization after turning on the system?
Does the equipment's Up/Down switch work
properly?
Does the test image have excellent quality?
While installing equipment
After installation Checklist
Yes
No
Yes
No

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents