Vatech Green 21 PCT-90LH User Manual page 117

Table of Contents

Advertisement

3.
System delivery to site:
While installing equipment
Did you review and identify the delivery route and
method for equipment in advance?
Is the freight elevator available?
Are three installers available to move and unload the
equipment? (at least three installers)
4.
Before installation:
Site checklist
While installing equipment
Is the room large enough?
2,500mm(L) x 2,000mm(W) x 2,500mm(H) /
98" (L) x 79" (W) x 98" (H)
Is the door entrance wider than 800mm (31")?
Is there a radiation protection plan on the installation
site?
Do the equipment and PC use the same dedicated
circuit?
Do the electrical input conditions to the installation
site meet the MEIGaN requirements?
Is the compressor or air conditioner suction located
right next to the X-ray Room?
Is the floor flat and level?
Is the carpet on the floor? If so, remove it.
Appendix
Yes
No
Yes
No

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents