Upgrade Kit
Nitrogen Phosphorus Detector
•
•
Before starting, the following preliminary operations must be carried out:
1. Cool the oven and detector base body to room temperature.
2. Make sure that the detector base body is leak free.
3. Close the gas supplies.
4. Turn off the main power on the rear panel of the GC.
5. Disconnect the main power cable from the rear of the GC.
8
Configure the transformer.
Configure the detector.
Getting Started
Installation Guide