Download Print this page

Installation - Circontrol Post eVolve Series Installation Manual

Hide thumbs Also See for Post eVolve Series:

Advertisement

Installation

B
Positioning
1.
Remove the template nuts before proceeding.
2.
Place the Charge Point through the four foundation bolts. Make sure that the Charge Point
pre-holes of the metal plate match with the cable glands.
Post eVolve Charge Point series can be placed at outdoor or indoor areas to charge electric
vehicles. This product series is designed to placed on the ground.
13

Advertisement

loading
Need help?

Need help?

Do you have a question about the Post eVolve Series and is the answer not in the manual?

Questions and answers