Post eVolve Series Installation Manual
F
Verification
1 — P O W E R I N P U T
Before proceeding, make sure voltage is present in the terminal blocks.
For Three-Phase models pay special attention to Neutral Cable.
2 — M A I N T E N A N C E M O D E
Pull outward the Tamper Switch located in the lower half of the Charge Point.
3 — C A R E F U L W I T H T H E W I R E S
Before closing the unit, keep in mind all cables should remain inside.
4 — C H E C K T H E P L U G S
Plugs should be in good conditions before starting the unit.
5 — E L E C T R I C A L P R O T E C T I O N S
Rearm all the protections installed on the unit.
6 — C H E C K T H E B E AC O N I N D I C AT O R S
All beacon indicators should light properly. Here's the reference:
P L U G S TAT E
B E AC O N C O LO R
A v a i l a b l e
G r e e n
C h a r g i n g
B l u e
F a u l t
R e d
7 — O P E R AT I O N
Check no abnormal noise appears while the unit is charging.
8 — P R E V E N T I V E M A I N T E N A N C E
It is recommended to perform one preventive maintenance per year.
16
Need help?
Do you have a question about the Post eVolve Series and is the answer not in the manual?
Questions and answers