SANY SY365C LC Operation And Maintenance Manual page 232

Table of Contents

Advertisement

Maintenance
5. Lay a taut string or straightedge from the forward top roller to the idler.
Fig. 5-105
6. Measure the gap at location (1) (to the top of the track shoe).
7. Lay a taut string or straightedge from the rear top roller to the final-drive sprocket.
Fig. 5-106
8. Measure the gap at location (2) (to the top of the track shoe).
9. Add dimensions (1) and (2).
NOTE: The total should be 3–4 in. (76.2–101.6 mm).
10. Adjust the track tension as needed.
5-80
1
2
Operation and Maintenance Manual — 0420
SY365C LC Excavator OMM
0000226
0000227
SANY

Advertisement

Table of Contents
loading

Table of Contents