Defrost Control - Daikin J Series Service Manual

Hide thumbs Also See for J Series:
Table of Contents

Advertisement

SiBE041101

3.10 Defrost Control

Outline
Defrosting is carried out by the cooling cycle (reverse cycle). The defrosting time or outdoor
heat exchanger temperature must be more than a certain value to finish.
Detail
Conditions for Starting Defrost
Conditions for Canceling Defrost
The judgment is made with outdoor heat exchanger temperature. (J°C)
A (minutes)
B (Hz)
C (Hz)
D (seconds)
E (seconds)
F (seconds)
G (seconds)
H (pulse)
J (°C)
Function and Control
The starting conditions is determined with the outdoor temperature and the outdoor heat
exchanger temperature.
The system is in heating operation.
The compressor operates for 6 minutes.
More than A minutes of accumulated time pass since the start of the operation, or ending the
previous defrosting.
Frequency
ON
Compressor
OFF
ON
Four way valve
OFF
ON
Fan
OFF
Electronic expansion
valve opening
20 class
28
76
86
50
60
600
50
350
4 ~18
B Hz
0 Hz
E sec.
D sec.
F sec.
5 sec.
450 pulse
H pulse
25/35 class
42 class
28
30
76
48
86
70
50
60
60
120
600
650
60
30
350
350
4 ~18
4 ~15
Control Specification
C Hz
G sec.
5 sec.
450 pulse
Initial opening
50 class
44
55
90
60
120
460
30
450
4 ~12
PI control
(R13533)
44

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents