STEP BY STEP CABINET INSTALLATION
Step 1.
Prepare Site.
Ensure that gas and electrical supplies have been prepared in accordance with the heater engine
Installation Manual.
IMPORTANT
Step 2.
Unpacking.
Gross weight of appliance is 85kg. Two person lift required for this step.
CAUTION
1.
Remove the plastic strapping and lift the cardboard box directly
up off from the appliance. Remove all packing materials.
2.
Ensure to locate and keep the Engine Accessories pack and
labels.
3.
Lift the appliance from the pallet and place in position.
Step 3.
Remove fascia.
1.
Locate and LOOSEN the 3 x M4 (7mm AF) hex head screws at the top of the discharge vent A. The fascia
holes are slotted. Leave the screws loose in the panel.
2.
Locate and remove the screws at the bottom left and right of the inlet vent .
3.
Firmly draw fascia out and away and place carefully aside.
A
B
Rinnai
CABINET INSTALLATION
B
9
Remove all Labels and the
Accessories Pack
650FS FIM