Cabinet Installation - Rinnai SS850 Installation Manual

Hide thumbs Also See for SS850:
Table of Contents

Advertisement

INSTALLATION

CABINET INSTALLATION

There are two ways to install the cabinet to the SS850 Freestanding:
Complete assembly.
1.
Prepare mounting area for fixing and services.
2.
Lay the fire on its back.
3.
Fix the partially assembled cabinet to the fire.
4.
Fix the fire in place and connect power and
gas supplies.
Mounting area.
1.
Mark the flue centre on the floor.
2.
Fold the base panel locator tabs up as
shown on the next page.
3.
Check there is sufficient timber under the
screw mounting holes to provide adequate
retention. If necessary, underfloor blocking
may be required. A minimum of four screws,
two front and back, are required.
Do not fix the fire in place yet unless there is
sufficient room behind the fire to get a screwdriver
in to fix the back panel in place.
Make the cabinet.
Working on a flat surface, assemble the outer
cabinet panels as shown on the next page. Make
sure the cabinet is square and that the top surfaces
are flush with each other.
Rinnai
SS850 Fresstander
Inner side panels x 2
Base mounting plate
Cabinet
Accessory
Flexi tube & connector
LH outer side panel
Back cover
Base cover plate
Build up (requires two people).
1.
Prepare mounting area for fixing, power and
gas supplies.
2.
Fix partially assembled cabinet base to the
floor.
3.
Lift fire onto the cabinet and fix together.
4.
Connect power and gas supplies.
Fix the cabinet to the fire and check aer-
ation.
Unpack the fire as per instructions on page 14.
To make the fire lighter and easier to manage,
remove the glass front, log set, and ceramic panels
from the inside of the combustion chamber.
Before doing anything else, check the aeration
plate setting, refer previous page.
Fix the cabinet (make sure panels are flush,
especially on the front and sides) to the fire, either:
Lay the fire on its back and fit the cabinet
using nine screws, stand it up and fix in
place, or
Fix the cabinet to the floor, fit the cube onto
the cabinet, and fix in place.
Connect services and commission.
Before adding the cabinet cover panels (see
next page), connect the power and gas. There
is a second stainless steel flexi tube connector
supplied with the cabinet kit to make connection
easier. Commission as per the commissioning
instructions on page 30.
16
Screw pack (30 screws)
Back outer panel
RH outer side panel
SS850 Freestanding IM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ss850fcanSs850fcal

Table of Contents