Introduction

1.
Detailed below is the installation procedure for the spectrometer. It is very important that
these procedures are followed, in correct order and taking account of the time delays
required. Failure to do so can result in extended installation and possible damage. The
procedures and delays are designed to prevent problems with purge, software, firmware and
hardware.
The installing engineer should read the optical problems on installation section of the
installation documentation.
The boxes at the end of each section should be initialled by the installing engineer to indicate
completion of the section, before proceeding to the next section.
Standard engineer tools, C-Term software (from Cetac Automation), a water flow meter
and an air flow meter are required.
It is essential that an overnight purge has occurred and has been checked before the manual
performance testing occurs.
Several instances for customer training and customer practice are essential.