Installing The Stopper Assembly; Installing The Nose Gear Wheel - Seagull Models SEA12 Assembly Manual

Pc-9 semi scale arf model, hand-made almost ready to fly r/c model aircraft
Table of Contents

Advertisement

PC-9
Install the pushrod wire as shown.
Adjustable
Connector.

INSTALLING THE NOSE GEAR WHEEL.

Slide one 60mm diameter wheel collar onto
the axle and tighten. Slide the nose wheel on
and push it up against the wheel collar. Slide
the remaining wheel collar on and push it up
against the wheel and tighten the set screw.
The wheels should spin free and not bind in
any way.
10
Instruction Manual.
FUEL TANK.

INSTALLING THE STOPPER ASSEMBLY.

1) Using a modeling knife, carefully cut
off the rear portion of one of the two nylon tubes
leaving 1/2" protruding from the rear of the
stopper. This will be the fuel pick up tube.
2) Using a modeling knife, cut one length
of silicon fuel line (not included) to 2-1/4" long.
Connect one end of the line to the weighted
fuel pickup and the other end to the nylon
pickup tube.
3) Carefully bend the second nylon tube
up at a 45º angle. This tube is the vent tube.

Advertisement

Table of Contents
loading

Table of Contents