Pitney Bowes FastPac DI950 Operator's Manual page 54

Hide thumbs Also See for FastPac DI950:
Table of Contents

Advertisement

3 • Basic Operation
Loading Material
into the Trays
(continued)
3-12
Loading Insert Trays (continued)
5. Finish loading the Tray to the appropriate fill line for the insert type.
6. Tilt the material slightly toward the back of the Tray.
7. While holding the material in the tilt position, gently pull up on the Sled
Lock Release to unlock it. Allow the Sled to move forward.
8. Slide the Sled until it contacts the end piece in the stack of material, and
then release your hold on the material.
NOTE: Items in the Mail Piece Icon Tree on the Display represent the mate-
rial in the selected job. Use the Arrow keys to highlight any icon to view a
picture of the orientation of material in the Tray, and the designated location of
that Tray on the Feeder Tower.
Sled
Side Guide
Figure 3.4.2: Final Position of Inserts
SV61311 Rev. E

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents