Introduction; Overview; Iso154Xevm Kit Contents - Texas Instruments ISO154 EVM Series User Manual

Low-power bidirectional i2c isolators evaluation module
Table of Contents

Advertisement

Introduction

1
Introduction
This User's Guide details the ISO154x Evaluation Module (EVM) operation of the factory-installed
ISO1540 and ISO1541 I
two ISO1540 or two ISO1541 instead of one of each.
This Guide presents a typical laboratory setup used with this EVM.
This Evaluation Module (EVM) is made available for isolator parameter
performance evaluation only and is not intended for isolation voltage testing. To
prevent damage to the EVM, any voltage applied as a supply or digital
input/output must be maintained within the 0 V to 5.5 V recommended
operating range.
Exceeding the specified input voltage range may cause unexpected operation and irreversible damage to
the EVM. If there are questions concerning the input voltage range, contact a TI field representative prior
to connecting power.
Applying loads outside the specified output range may result in unintended operation and possible
permanent damage to the EVM. If there is uncertainty as to the load specification, contact a TI field
representative.
1.1

Overview

The ISO154x devices are low-power, bidirectional isolators that are compatible with I
logic input and output buffers on these devices are separated by TI's Capacitive Isolation technology
utilizing a silicon dioxide (SiO
devices block high voltages, isolate grounds and prevent noise currents from entering the local ground
and interfering with or damaging sensitive circuitry.
The ISO1540 has two isolated bidirectional channels for clock and data lines and is fit for multi-master
applications. The ISO1541 has a bidirectional data and a unidirectional clock channel and is useful in
applications that have a single master.
These devices achieve isolated bidirectional communication by introducing an offset, making the side 1
low-level output greater than the side 1 low-level input and thus preventing an internal logic latch that
otherwise would occur with standard digital isolators.
1.2

ISO154xEVM Kit Contents

1. ISO154xEVM Circuit Board (PWB P/N 6547206)
2. ISO154xEVM User's Guide
3. ISO154x Datasheet (SLLSEB6)
2
ISO154xEVM Low-Power Bidirectional I
2
C-compatible bidirectional isolators. The EVM may be reconfigured for use with
CAUTION
) barrier. When used in conjunction with isolated power supplies, these
2
(SLLU166
- this document)
2
C Isolators Evaluation Module
Copyright © 2012, Texas Instruments Incorporated
www.ti.com
2
C interfaces. The
SLLU166 – June 2012
Submit Documentation Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ISO154 EVM Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Iso1540Iso1541

Table of Contents