Bill Of Materials; Iso154X Evm Bill Of Materials - Texas Instruments ISO154 EVM Series User Manual

Low-power bidirectional i2c isolators evaluation module
Table of Contents

Advertisement

www.ti.com
3

Bill of Materials

The parts list for the ISO154xEVM is shown in
Item
Qty. References
1
4
C1,C2,C3,C4
2
4
C5,C6,C7,C8
3
2
J1,J2
4
8
R1,R2,R3,R4,R5,R6,R7,R8
TP1,TP2,TP3,TP4,TP5,TP6,TP7,TP8,TP9,
TP10,TP11,TP12,TP13,TP14,TP15,TP16,
TP17,TP18,TP19,TP20,TP21,TP22,TP23,
TP24,TP25,TP26,TP27,TP28,TP29,TP30,
TP31,TP32,TP33,TP34,TP35,TP36,TP37,
5
70
TP38,TP39,TP40,TP41,TP42,TP43, TP44,
TP45,TP46,TP47,TP48,TP49,TP50,TP51,
TP52,TP53,TP54,TP55,TP56,TP57,TP58,
TP59,TP60,TP61,TP62,TP63,TP64,TP65,
TP66,TP67,TP68,TP69,TP70
6
1
U1
7
1
U2
8
4
Notes: 1. J3A on EVM silkscreen is TP30, TP63, TP33, TP32 grouped as single row 4-pin jumper.
2. J4A on EVM silkscreen is TP23, TP5, TP17, TP25 grouped as single row 4-pin jumper.
3. J5A on EVM silkscreen is TP36, TP65, TP39, TP38 grouped as single row 4-pin jumper
4. J6A on EVM silkscreen is TP27, TP6, TP20, TP24 grouped as single row 4-pin jumper.
5. J3B on EVM silkscreen is TP35, TP66, TP34, TP37 grouped as single row 4-pin jumper.
6. J4B on EVM silkscreen is TP29, TP7, TP2, TP26 grouped as single row 4-pin jumper.
7. J5B on EVM silkscreen is TP41, TP64, TP40, TP43 grouped as single row 4-pin jumper.
8. J6B on EVM silkscreen is TP31, TP8, TP4, TP28 grouped as single row 4-pin jumper
9. J7A on EVM silkscreen is TP44, TP68, TP47, TP46 grouped as single row 4-pin jumper.
10. J8A on EVM silkscreen is TP42, TP9, TP19, TP45 grouped as single row 4-pin jumper.
11. J9A on EVM silkscreen is TP49, TP69, TP51, TP50 grouped as single row 4-pin jumper.
12. J10A on EVM silkscreen is TP48, TP10, TP22, TP53 grouped as single row 4-pin jumper.
13. J7B on EVM silkscreen is TP54, TP70, TP57, TP56 grouped as single row 4-pin jumper.
14. J8B on EVM silkscreen is TP52, TP11, TP3, TP55 grouped as single row 4-pin jumper.
15. J9B on EVM silkscreen is TP61, TP67, TP60, TP62 grouped as single row 4-pin jumper.
16. J10B on EVM silkscreen is TP58, TP12, TP1, TP59 grouped as single row 4-pin jumper.
17. SJ5303 Bumpon Hemisphere: one each to be assembled at every corner of the board on the bottom side.
SLLU166 – June 2012
Submit Documentation Feedback
Table
2.
Table 2. ISO154x EVM Bill of Materials
Part
CAPACITOR, SMT, 0603, CERAMIC, 1.0 µF, 25 V, 10%,
X5R
CAPACITOR, SMT, 0603, CERAMIC, 1.0 µF, 25 V, 10%,
X5R
CONNECTOR, THU, TERMINAL BLOCK, 2.54 mm LS, 2P
RESISTOR, SMT, 0603, 1.0 kΩ, 0.1%, 1/10W
HEADER, THU, 1P, MALE, SINGLE ROW
IC, ISO1540, SMT, SOIC8D
IC, ISO1541, SMT, SOIC8D
Rubber feet, SJ5303, Bumpon hemisphere
ISO154xEVM Low-Power Bidirectional I
Copyright © 2012, Texas Instruments Incorporated
Bill of Materials
Manufacturer
TAIYO_YUDEN/ANY
TAIYO_YUDEN/ANY
TYCO/ANY
PANASONIC/ANY
SAMTEC/ANY
TI
TI
2M
2
C Isolators Evaluation Module
9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ISO154 EVM Series and is the answer not in the manual?

This manual is also suitable for:

Iso1540Iso1541

Table of Contents