Iso154Xevm Description - Texas Instruments ISO154 EVM Series User Manual

Low-power bidirectional i2c isolators evaluation module
Table of Contents

Advertisement

www.ti.com
Label
U1
U2
J1
J2
TP15, TP47
TP18, TP34
TP13
TP16
J3A, J4A
J5A, J6A
J3B, J4B
J5B, J6B
J7A, J8A
J9A, J10A
J7B, J8B
J9B, J10B
C1, C2, C3, C4
C5, C6, C7, C8
R1, R2, R5, R6
R3, R4, R7, R8
SLLU166 – June 2012
Submit Documentation Feedback
Table 1. ISO154xEVM Description
Description
ISO154x, by default populated as ISO1540
ISO154x, by default populated as ISO1541
Side 1 power supply terminal block (VCC1)
Side 2 power supply terminal block (VCC2)
Side 1 GND test point (GND1)
Side 2 GND test point (GND2)
VCC1 test point
VCC2 test point
4-pin jumper to VCC1, SDA1, GND1 for U1
4-pin jumper to VCC1, SCL1, GND1 for U1
4-pin jumper to VCC2, SDA2, GND2 for U1
4-pin jumper to VCC2, SCL2, GND2 for U1
4-pin jumper to VCC1, SDA1, GND1 for U2
4-pin jumper to VCC1, SCL1, GND1 for U2
4-pin jumper to VCC2, SDA2, GND2 for U2
4-pin jumper to VCC2, SCL2, GND2 for U2
1.0 µF filter capacitor
0.1 µF filter capacitor
1-kΩ 0603 footprint pull-up resistor to VCC1
1-kΩ 0603 footprint pull-up resistor to VCC2
ISO154xEVM Low-Power Bidirectional I
Copyright © 2012, Texas Instruments Incorporated
Introduction
2
C Isolators Evaluation Module
5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ISO154 EVM Series and is the answer not in the manual?

This manual is also suitable for:

Iso1540Iso1541

Table of Contents