4- APPLIANCE START-UP
The start-up must be performed by a qualified technician. Make sure the installation is completed and the
oil tank has been filled up. The oil line must also have been purged.
CAUTION: CLOSE THE BLOWER COMPARTMENT ACCESS
5- PROLONGED CLOSING
A) Cut off the electric circuit
B) Close the oil shut-off valve
NOTE: The shut-off valve must be closed when the appliance is out of service for a prolonged period of
time.
6- MAINTENANCE
At the beginning of heating season, have the complete installation inspected by a qualified service man,
especially the lighting system and the controls.
NOTE: THE UNIT'S MAINTENANCE, REPAIRS AND THE CLEANING OF
THE OIL FILTER MUST BE DONE BY A QUALIFIED TECHNICIAN.
SERVICE:
Before calling for service, first check the following:
-
Fuel supply
-
Electric fuses or breakers
-
Thermostat setting
-
Fan limit controls settings
-
The state of the green diagnostic LED on the burner control (see section: 3. APPLIANCE
INSTALLATION, COMBUSTION SAFETY CONTROL).
PANEL BEFORE STARTING THE BURNER.
37