Schematic, PCB Layout, and Bill of Materials
Designator
Quantity
SH-J1, SH-J2, SH-J3, SH-J4,
7
SH-J5, SH-J6, SH-J7
TP1, TP2, TP3, TP4
4
TP5
1
U1
1
U2
1
U3
1
U4
1
R15, R16, R38, R43, R46
0
R40, R44
0

4.5 DAC53204EVM Bill of Materials

Designator
Quantity
!PCB
1
C1, C2, C4
3
J1, J2
2
R1, R2, R3, R4
4
U1
1
C5
1
C3
1
R5, R6, R7, R8, R13, R14,
12
R15, R16, R17, R18, R19,
R20
28
DAC53204EVM User's Guide
Table 4-1. BOOSTXL-DAC-PORT Bill of Materials (continued)
Value
Description
1x2
Shunt, 100mil, Gold plated,
Black
Test Point, Compact, Red, TH Red Compact Testpoint
Test Point, Miniature, SMT
4-Bit Bidirectional Multi-
Voltage Level Translator for
Open-Drain & Push-Pull,
PW0014A (TSSOP-14)
8-Bit Dual-Supply Bus
Transceiver with Configurable
Voltage-Level Shifting
and Three-State Outputs,
PW0024A (TSSOP-24)
Precision Micropower
Shunt Voltage Reference,
DBZ0003A (SOT-23-3)
Precision Micropower
Shunt Voltage Reference,
DBZ0003A (SOT-23-3)
0
RES, 0, 5%, 0.1 W, 0603
33
RES, 33, 5%, 0.1 W, AEC-
Q200 Grade 0, 0603

Table 4-2. DAC53204EVM Bill of Materials

Value
Description
Printed Circuit Board
0.1 uF
CAP, CERM, 0.1 µF, 50 V,+/-
5%, X7R, 0603
Header, 2.54mm, 16x1, TH
10.0 k
RES, 10.0 k, 1%, 0.1 W, 0603 0603
12-Bit, I2C/SPI Interface,
Buffered Voltage Output DAC
2.2 uF
CAP, CERM, 2.2 uF, 10 V, +/-
10%, X7R, 0603
1 uF
CAP, CERM, 1 µF, 50 V,+/-
10%, X7R, 0805
0
RES, 0, 5%, 0.1 W, 0603
Copyright © 2021 Texas Instruments Incorporated
Package Reference
Part Number
Shunt
SNT-100-BK-G
5005
Test Point, Miniature, SMT
5019
PW0014A
LSF0204DPWR
PW0024A
SN74LVC8T245PW
DBZ0003A
LM4040DIM3-5.0/NOPB
DBZ0003A
LM4040DIM3X-2.5/NOPB
0603
RC0603JR-070RL
0603
CRCW060333R0JNEA
Package Reference
Part Number
DC159
0603
06035C104JAT2A
Header, 2.54mm, 16x1, TH
22284160
RC0603FR-0710KL
DSG0008A
DAC53204RTER
0603
C1608X7R1A225K080AC
0805
GJ821BR71H105KA12L
0603
RC0603JR-070RL
www.ti.com
Manufacturer
Samtec
Keystone
Keystone
Texas Instruments
Texas Instruments
Texas Instruments
Texas Instruments
Yageo America
Vishay-Dale
Manufacturer
Any
AVX
Molex
Yageo America
Texas Instruments
TDK
Murata
Yageo America
SLAU851 – MARCH 2021
Submit Document Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DAC53204EVM and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Dac63204Dac53204Dac43204

Table of Contents