www.ti.com
3.2.2.3 DAC Quick-Start Page
This page is divided in to four tabs: Basic DAC, Margining, and Functions. The following subsections describe
each tab.
3.2.2.3.1 Basic DAC Tab
The Basic DAC quick-start tab is shown in
reference and output span, and program the output voltage (decimal) for the DAC53204. The DAC53204 comes
in Hi-Z power-down mode by default.
The basic DAC setup for power up, reference selection, and output span selection available in this tab
is common to all the tab functions.
SLAU851 – MARCH 2021
Submit Document Feedback
Figure
3-7provides an interface to quickly power up, select the
Note
Figure 3-7. DAC Quick-Start Page: Basic DAC Tab
Copyright © 2021 Texas Instruments Incorporated
Detailed Description
DAC53204EVM User's Guide
17
Need help?
Do you have a question about the DAC53204EVM and is the answer not in the manual?
Questions and answers