Overview
1.1
Purpose
The DAC5668/88/89EVM provides a platform for evaluating the DAC5668, DAC5688, and DAC5689
digital-to-analog (DAC) converter under various signal, reference, and supply conditions. All three DACs
are dual channel, 800MSPS interpolating DACs with DAC5668 being a 12-bit DAC and
DAC5688/DAC5689 being 16-bit DACs. Also, both the DAC5668 and the DAC5688 have internal
PLL/VCO, which is useful when a high-rate clock is not available at the system level. The table below
summarizes the comparisons among the DAC family. The evaluation module also allows designers to
analyze either a transformer-coupled output from the DAC or an RF-modulated output using Texas
Instruments (TI) TRF3703 analog quadrature modulator. Use this document with the EVM schematic
diagram and the corresponding device datasheet.
DAC5668
DAC5688
DAC5689
1.2
EVM Basic Functions
Digital inputs to the DAC can be provided with CMOS-level signals up to 250 MSPS through two 34-pin
headers. The analog outputs from the DAC are available via SMA connectors. Because of its flexible
design, the analog outputs of the DAC device can be configured to drive a 50-Ω terminated cable using a
4:1 or 1:1 impedance ratio transformer, or single-ended referred to AVDD. The EVM also allows for an
option to use TI's TRF3703 analog quadrature modulator to mix the DAC outputs to RF.
The EVM also includes a TI CDCM7005 clock distribution device to clock the system. The CDCM7005 can
be used with an onboard VCXO for full PLL functionality or with an external signal source, in which case
the CDCM7005 functions as a buffer.
Power connections to the EVM are via banana jack sockets. In addition to the internal bandgap reference
provided by the DAC device, the EVM allows an external reference to be provided to the DAC.
The DAC5668/88/89EVM allows the user to program the DAC and CDCM7005 registers through a USB
port. The interface allows read and write access to all the DAC5668/88/89 registers and write-only access
to the CDCM7005 registers.
1.3
Power Requirements
The DAC5668/88/89EVM requires 1.8-Vdc and 3.3-Vdc supplies for normal operation. An additional 5-Vdc
supply is required to power up the TRF3703 for RF measurements.
SLAU241A – June 2008 – Revised March 2010
Submit Documentation Feedback
Table 1. Device Comparisons
12-Bit
16-Bit
X
X
X
Copyright © 2008–2010, Texas Instruments Incorporated
User's Guide
SLAU241A – June 2008 – Revised March 2010
DAC5668/88/89EVM
PLL/VCO
EVM Software
X
DAC5688
X
DAC5688
DAC5689
DAC5668/88/89EVM
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DAC5668EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments DAC5668EVM

  • Page 1 The DAC5668/88/89EVM requires 1.8-Vdc and 3.3-Vdc supplies for normal operation. An additional 5-Vdc supply is required to power up the TRF3703 for RF measurements. SLAU241A – June 2008 – Revised March 2010 DAC5668/88/89EVM Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 2: Software Installation

    Installing the EVM Control Software Double-click the setup.exe file located on the installation CD. The EVM Installation Wizard opens. Figure 1. DAC5668/88/89/89EVM Install Screen DAC5668/88/89EVM SLAU241A – June 2008 – Revised March 2010 Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 3 Instruct the Hardware Wizard to find the software automatically. If Windows is unable to find the drivers automatically, point it to the EVM program folder. The default folder for DAC5668/DAC5688 EVM software is C:\Program Files\Texas Instruments\DAC5688\DAC5688 Drivers. The default folder for DAC5689 EVM software is C:\Program Files\Texas Instruments\DAC5689\DAC5689 Drivers. A warning indicating that the drivers are unsigned by Windows appears.
  • Page 4 The block diagram of the EVM is shown in Figure 5. As illustrated on the block diagram, the DAC5668/88/89EVM includes three Texas Instruments components that make the entire solution an excellent choice for radio systems. DAC5668/88/89EVM SLAU241A – June 2008 – Revised March 2010 Submit Documentation Feedback Copyright ©...
  • Page 5 Before starting evaluation, the user should decide on the configuration and make the appropriate connections or changes. The demonstration board comes with the following factory-set configuration: SLAU241A – June 2008 – Revised March 2010 DAC5668/88/89EVM Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 6: Jumper Settings

    +1.8-V connection pair. J15/J16 3.3V Banana Plug +3.3-V connection pair. OUTCLK2 Y3A Optional CDCM7005 clock output. OUTCLK2 Y4A Optional CDCM7005 clock output. DAC5668/88/89EVM SLAU241A – June 2008 – Revised March 2010 Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 7: Usb Interface

    Description CMOS data bit 0 (LSB) CMOS data bit 9 CMOS data bit 1 CMOS data bit 10 CMOS data bit 2 SLAU241A – June 2008 – Revised March 2010 DAC5668/88/89EVM Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 8: Clock Configuration

    PLL lock indicator. The PLL lock indicator is connected to LED D4 (JP5 must be in position 2-3). The DAC5689 does not have the internal PLL feature thus the PLL lock indicator is not functional. DAC5668/88/89EVM SLAU241A – June 2008 – Revised March 2010 Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 9: Output Configuration

    LC filter. By default, it is only populated with a simple LC low-pass filter to attenuate the higher clock harmonics. The 3-dB corner of this filter is approximately 300 MHz. SLAU241A – June 2008 – Revised March 2010 DAC5668/88/89EVM Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 10: Software Description

    The software has five main settings that allow you to modify the functionality of the active panels. You can switch between these settings by selecting one of the Menu items described in Table DAC5668/88/89EVM SLAU241A – June 2008 – Revised March 2010 Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 11 Saves the DAC and CDCM7005 register configurations to a text file for future use. Load Settings: Loads a DAC and CDCM7005 register configuration from a text file and updates the GUI. SLAU241A – June 2008 – Revised March 2010 DAC5668/88/89EVM Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 12 NCO IF (MHz): Desired mixing frequency in MHz when using the DAC mixer. Update mixer: Used to update the NCO DDS register value. DAC5668/88/89EVM SLAU241A – June 2008 – Revised March 2010 Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 13 1. Connect the DAC5668/88/89EVM digital connector (J2 and J7) to a digital test pattern generator capable of providing 3.3-V or 1.8-V CMOS logic level inputs such as Texas Instruments TSW3100. 2. Use the DAC5668/88/89 EVM DAC_CLKOUT (J21) SMA connector to trigger the pattern generator. In the case of the TSW3100 pattern generator, the trigger input is CMOS CLK (J73) SMA connector.
  • Page 14: Bill Of Materials

    8. Program the CDCM7005 and DAC registers as necessary. An example configuration file example.txt is included under the installation folder: C:\Program Files\Texas Instruments\DAC5688/89\DAC5688/89 Configuration Files\ 9. Program and run the pattern generator. If using the TSW3100, see the user’s guide for more information on how to set up a digital pattern.
  • Page 15 R47 R53 R59 0603 Yageo RC0603FR-07115RL R48 R54 R60 0603 Yageo RC0603FR-07634RL R49 R52 R61 60.4 0603 Yageo RC0603FR-0760R4L 49.9 0402 Panasonic ERJ-2RKF49R9X SLAU241A – June 2008 – Revised March 2010 DAC5668/88/89EVM Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 16 X_SCREW1- SCREW PANHEAD 4-40 x Building Fasteners PMS 440 0038 PH X_SCREW6 X_STANDOFF1- STANDOFF ALUM HEX 4-40 Keystone 2203 X_STANDOFF4 x .500 DAC5668/88/89EVM SLAU241A – June 2008 – Revised March 2010 Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 17: Printed-Circuit Board Layout

    Bill of Materials and Schematics www.ti.com Printed-Circuit Board Layout The following illustrations present the layers of the DAC5668/88/89EVM board. SLAU241A – June 2008 – Revised March 2010 DAC5668/88/89EVM Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 18 Bill of Materials and Schematics www.ti.com Figure 6. Top Silk Screen DAC5668/88/89EVM SLAU241A – June 2008 – Revised March 2010 Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 19 Bill of Materials and Schematics www.ti.com Figure 7. Layer 2, GND SLAU241A – June 2008 – Revised March 2010 DAC5668/88/89EVM Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 20 Bill of Materials and Schematics www.ti.com Figure 8. Layer 3, GND DAC5668/88/89EVM SLAU241A – June 2008 – Revised March 2010 Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 21 Bill of Materials and Schematics www.ti.com Figure 9. Layer 4, PWR SLAU241A – June 2008 – Revised March 2010 DAC5668/88/89EVM Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 22 Bill of Materials and Schematics www.ti.com Figure 10. Layer 5 DAC5668/88/89EVM SLAU241A – June 2008 – Revised March 2010 Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 23 Bill of Materials and Schematics www.ti.com Figure 11. Layer 6, PWR SLAU241A – June 2008 – Revised March 2010 DAC5668/88/89EVM Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 24 Bill of Materials and Schematics www.ti.com Figure 12. Layer 7, GND DAC5668/88/89EVM SLAU241A – June 2008 – Revised March 2010 Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 25 Bill of Materials and Schematics www.ti.com Figure 13. Bottom Silk Screen SLAU241A – June 2008 – Revised March 2010 DAC5668/88/89EVM Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 26 Bill of Materials and Schematics www.ti.com Schematics The DAC5668/88/89EVM schematics appear on the following pages. DAC5668/88/89EVM SLAU241A – June 2008 – Revised March 2010 Submit Documentation Feedback Copyright © 2008–2010, Texas Instruments Incorporated...
  • Page 27 IOVDD DNI = DO NOT INSTALL EXTLO RESET RESET +1.8VCLK C113 C113 .1uF .1uF SW RESET SW RESET 1000pF 1000pF .033uF .033uF 10uF 10uF .1uF .1uF 93.1 93.1 IOUTB1 SH3,7 IOUTB2 SH3,7 330pF 330pF IOUTA2 SH3,7 +3.3V_DAC IOUTA1 SH3,7 /RESET SH2,4 .01uF .01uF +1.8VD1...
  • Page 28 4816P-001-220 4816P-001-220 TSM-117-01-S-DV-LC TSM-117-01-S-DV-LC DA_15 DA15 DA_14 DA14 DA_13 DA13 DA_12 DA12 DA_11 DA11 DA_10 DA10 DA_9 DA_8 DA_7 +3.3V_LOGIC IOVDD DA_6 DA_5 DA_4 DA_3 DA_2 DA_1 DA_0 DA[0..15] SH1 4816P-001-220 4816P-001-220 SYNC 22.1 22.1 EXTLO SH1 /CDC_PD SH4 /RESET SH1,4 /CLKOUT_EN SH1 SYNC SH1 TX_ENABLE SH1...
  • Page 29 +5VA DNI = DO NOT INSTALL C114 C114 .01uF .01uF SH1,7 IOUTB1 68nH 68nH 60.4 60.4 4.7pF 4.7pF 10nH 10nH +5VA 2.2pF 2.2pF 2.7pF 2.7pF 90.9 90.9 10nH 10nH R106 R106 SH1,7 IOUTB2 68nH 68nH 60.4 60.4 4.7pF 4.7pF C116 C116 .01uF .01uF...
  • Page 30 VCXO VCXO DNI = DO NOT INSTALL LED GREEN LED GREEN LED GREEN LED GREEN LOCK LOCK LED GREEN LED GREEN +3.3V_LOGIC +3.3V_LOGIC +3.3V_LOGIC 560pF 560pF .1uF .1uF 10uF 10uF +3.3V_LOGIC +3.3V_LOGIC CLK2CB SH1 VCXOB VCXOB CLK2B SH1 V_CTRL 82.5 82.5 82.5 82.5...
  • Page 31 68 OHM @ 100MHz 68 OHM @ 100MHz +3.3V_LOGIC +3.3V_LOGIC .1uF .1uF 4.7uF 4.7uF 10nF 10nF C107 C107 .1uF .1uF USB_CONN USB_CONN R113 R113 R112 R112 GND1 -DATA +DATA GND2 C106 C106 C105 C105 47pF 47pF 47pF 47pF R104 R104 22.1 22.1 SDIO...
  • Page 32 +1.8VD +5VA +1.8V_IN +5V_IN +1.8VD +1.8VD +5VA +5VA BANANA_JACK_RED BANANA_JACK_RED 68 OHM @ 100MHz 68 OHM @ 100MHz BANANA_JACK_RED BANANA_JACK_RED 68 OHM @ 100MHz 68 OHM @ 100MHz 47uF 47uF 47uF 47uF C112 C112 C115 C115 .01uF .01uF .01uF .01uF 10uF 10uF 10uF...
  • Page 33 +3.3V_DAC +3.3V_DAC SH1,3 IOUTB2 ADT4-1T ADT4-1T 60.4 60.4 IOUTB1 IOUTB1 56nH 56nH +3.3V_LOGIC +3.3V_LOGIC 60.4 60.4 .1uF .1uF EXT_REF_CLK EXT_REF_CLK 1000pF 1000pF IOUTB2 IOUTB2 SH1,3 IOUTB1 .1uF .1uF REF_CLK REF_CLK +3.3V_DAC (SHUNT 2-3) (SHUNT 2-3) SN74LVC1G125DBVR SN74LVC1G125DBVR REF_OSC SH4 +3.3V_DAC 22.1 22.1 +3.3V_LOGIC...
  • Page 34: Evaluation Board/Kit Important Notice

    EVALUATION BOARD/KIT IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 35: Important Notice

    IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications, enhancements, improvements, and other changes to its products and services at any time and to discontinue any product or service without notice. Customers should obtain the latest relevant information before placing orders and should verify that such information is current and complete.

This manual is also suitable for:

Dac5688evmDac5689evm

Table of Contents