Download Print this page

Vulcan-Hart GRS25 Service Manual page 32

Hide thumbs Also See for GRS25:

Advertisement

8. Note and remove any old fittings left on the valve. Keep them for reassembly to the new valve.
9. Install the old fittings removed in step 8 to the new valve.
10. Install the new valve by reversing steps 1- 7.
11. Insure all wiring and gas lines are securely installed.
12. Check system with soap and water solution for gas leakage.
REMOVAL BURNER
1. Follow steps 1-3 under Removal of Control Housing (Millivolts).
2. In the GRD and GRC Series Fryer disconnect the control housing harness plug and remove the housing
from the fryer. For the GRS Series Fryer carefully lower the housing out of the way without removing or
kinking the KX thermostat wiring.
3. With a 5/16" socket remove (4) 10-24 screws holding the heat shield in place.
4. Slide the heat shield down to expose the burner mounting screws. (Fig. 40)
Fig. 40
32

Advertisement

loading