Download Print this page

Vulcan-Hart GRS25 Service Manual page 39

Hide thumbs Also See for GRS25:

Advertisement

4. With 1/4" socket remove (2) screws securing the transformer to the control box. (Fig. 53)
Fig. 53
5. Install new transformer by reversing steps 1-4.
REMOVAL OF ELECTRICAL SUPPLY CORD
Note: The power supply line for a fryer with filter inter plumb is located in the rear of appliance housed in a junction
box. Disengage (2) screws mounting the cover to the box, then remove the cord by following steps 3-5 below.
1. Follow steps 1-6 under Removal of Supply Box.
2. Follow steps 1-2 under Access of Controls Inside the Supply Box.
3. From the rear of the box with a flat blade screwdriver remove (2) screws holding the cord mounting clamp
to the box. (Figs. 54)
Supply Box
Filter Junction Box
Figs. 54
39

Advertisement

loading