Download Print this page

Vulcan-Hart GRS25 Service Manual page 13

Hide thumbs Also See for GRS25:

Advertisement

4. Reinstall panel by reversing steps 1-3.
CONTROL PANEL (ELECTRONIC IGNITION)
1. Follow steps 1 through 3 under Standard Millivolt Construction. (Fig. 3)
2. Disconnect basket lift (applicable) or main wire harness before removing the control panel and fryer door.
CONTROL PANEL (SOLID STATE CONSTRUCTION)
1. Follow steps 2-3 under Standard Millivolt Construction. (Fig. 4)
2. Disconnect basket lift ( if applicable) and main wire harness before removing the control panel and fryer door.
3. Reinstall panel by reversing steps 1-2.
Fig. 3
Fig. 4
13

Advertisement

loading