Pre-Installation Requirements

Personnel Technical Level Required for Installation

Storage Prior to Installation

If the ta7000R is stored for any period of time prior to installation, store the
equipment in an environment where it is not subject to dripping or splashing
liquids, corrosive gases, high humidity, or excessive heat or cold. Recommend-
ed storage conditions include:
Temperature:
Relative Humidity:
Failure to comply with these storage conditions will void your warranty.

Unpacking and Inspecting the Equipment

Remove any packing material from the ta7000R Monitor. Check for damage. If
equipment is damaged, notify the carrier and contact AMETEK Service
(https://www.AMETEKpi.com/customersupport/requestsupport) immediately
if parts are missing or damage is found, and to verify if damaged parts will
require replacement prior to safely installing and operating the equipment.
Perform the following inspections to ensure that the ta7000R has not been
damaged during shipment:
PN T900-013, Rev A
The operations in this section should be performed only by qualified
service personnel experienced in electrical safety techniques. Never
service the ta7000R unless power to is has been removed, and it has
been allowed to cool for at least 90 minutes. Also, always use gloves
when working on the ta7000R.
0 °C to 50 °C (32 °F to 122 °F)
<70 %
Inspect the shipping container exterior for evidence of damage or indica-
tions of excess moisture before unpacking.
Carefully open the shipping container and remove the ta7000R. Inspect
the exterior of the ta7000R for noticeable damage.
Do not discard the shipping container until installation is complete.