2.3.4 Install the PROBOIL boiler
The boiler should be the last section of the product to install, you should already have the tap and filter installed
and the cold filtered 1/4" blue tube (E) and boiled water hose (X5) to the tap free and ready to connect.
⚠
WARNING
:
You must not solely use the overall assembly diagram as a guide to installation, we are not liable for
any safety or performance issues as a result of not following the step by step installation guide in this guide with due
care.
Key
Description
PROBOIL.4E boiler unit
A
½" male boiler inlet (with
B
internal check valve)
C
3/8" male boiler outlet
D
Mains power cable (1.4M)
¼" flexible blue inlet pipe
E
¼" x ¼" inlet pushfit
F
connector
G
½" blue Inlet "wingnut"
connector (with integral "flat"
rubber seal)
H
inlet connector meshed filter
seal
I
Outlet connector rubber seal
3/8" red Outlet "wingnut"
J
connector
K
Silicone outlet tube (1.25M)
L
8mm barbed stem x 3/8" male
tap connector
2 x Wall fixing screws
M
2 x Wall fixing plugs
N
O
½" inlet transport cap
P
3/8" outlet transport cap
(X5) 3/8" female flexible
(braided/silicone) hose tap
connector assembly and fibre
seal (supplied with tap)
Data connection extension
Q
lead (1.0M)
R
Built-in signal wire
(X4) Boiler data connection
PROBOIL.4E user & installation guide v1d
Drawing
X5
R
Q
39