In 1 Tap Installation Only (Taps Including Cold Filtered Water Function) - PROBOIL .4E User's Installation Manual

Hide thumbs Also See for PROBOIL.4E:
Table of Contents

Advertisement

7)
Find a suitable location for the filter head (F3). It should be sited where the filter cartridge (F5) can be easily
removed and replaced by the customer and within 600mm of tee (F11). We recommend installing the top of the
filter head 525mm above any obstruction; otherwise you must leave a minimum clearance of 50mm under the filter
cartridge (F5) to allow future replacement. Securely screw the filter head (F3) to the cabinet side or rear wall using
the screws supplied (F6).
The filter head can be mounted vertically or horizontally (though vertically is preferred) The filter head inlets are
marked with arrows to indicate the direction of flow through the filter.
Do not locate the filter above the mains power socket.
3/8" Blue pipe (F2) and ¼" blue pipe (E1, E2, E3) can be cut to differing lengths to allow a tidy and secure
installation regardless of the location of the filter, tap and boiler. All pipe ends should be cut squarely and cleanly using
a sharp knife or pipe snipping tool, whilst avoiding crushing the pipe ends. Plan and use a piping route that does not risk
kinking or stretching the pipe. For best performance and to help reduce flushing time required during each use of the
tap, keep any excess pipe length to a minimum.
8) Measure and cut the required length of blue pipe (F2) to run between push fit (F1) and the filter head inlet (F3).
Firmly push the blue pipe (F2) into both the push fit (F1) and the filter head inlet (F3) to secure the inlet pipe.
9) Firmly push the 3/8 stem x ¼" push fit adaptor (F7) into the filter head outlet (F3).
4 in 1 tap installation
4 in 1 tap installation
4 in 1 tap installation
4 in 1 tap installation only (taps including cold fil
only (taps including cold filtered water function).
only (taps including cold fil
only (taps including cold fil
PROBOIL.4E user & installation guide v1d
tered water function).
tered water function).
tered water function).
a) Cut a length of ¼" blue pipe (E1) and firmly
b) Firmly attach the push fit tee (F8) to the end
c) Screw pushfit (F9) into brass adaptor (X1).
d) Cut a second length of pipe (E2) and firmly
The remaining pipe (E3) will connect to the boiler
(see boiler instructions)
required to reach the tap, as it can always be
trimmed to length later.
push this into the push fit adaptor (F7).
of this length of pipe (E1).
We
We
We
We recommend using PTFE tape
recommend using PTFE tape
recommend using PTFE tape
recommend using PTFE tape
Note:
(do not use sealing compound) on the
(do not use sealing compound) on the
(do not use sealing compound) on the
(do not use sealing compound) on the
thread of the pushfit fittings to make a
thread of the pushfit fittings to make a
thread of the pushfit fittings to make a
thread of the pushfit fittings to make a
good seal without applying excessive
good seal without applying excessive
good seal without applying excessive
good seal without applying excessive
force (which may damage the plastic
force (which may damage the plastic
force (which may damage the plastic
force (which may damage the plastic
pushfit if overtightened).
pushfit if overtightened).
pushfit if overtightened).
pushfit if overtightened).
connect to the 3 way tee (F8). The pipe will
need routing towards the taps inlet (X1/F9).
Make pipe (E2) longer than the length
37

Advertisement

Table of Contents
loading

Table of Contents