2.3.1 Installation preparation

Preparing yourself to install the product is an important part of the installation and will help you overall to
improve the quality and speed of the installation of this product. If the product is to be installed without a
connected water supply "dry fit" you must follow our separate guide.
1) Turn off the hot and cold domestic water supplies or isolate both feeds with local isolation (service)
valves.
2) Remove any existing mixer tap from the tap hole and clean away any dirt or debris.
3) Check the tap hole diameter is 35mm Ø and no thicker than 40mm (unless specified differently within
the model specific tap instructions). Also please make sure that the distance from the tap hole centre
and any rear wall is greater than noted in the tap instructions.
4) Roughly lay out the approximate arrangement of the boiler, tap and filter within the cabinet to check
for any required alterations before progressing, if physically installing the product will be a problem,
do not progress the installation without rectifying it first.
5) Check the tap hole is no further than 1.2 meters away from the planned location of the boiler outlet. If
you require this to be further away you may need additional parts. Please call the service number to
request these.
6) Check the cold water mains pressure is between the accepted minimum and maximum range listed
within the "about the product" section.
7) Check the hot pressure is between the accepted minimum and maximum range listed on the tap
installation instructions.
8) Flush both the domestic hot and cold supply feeds to a bucket or the sink drain.
9) Check the mains power socket is switched, 13A, supports 2.15kW or greater, is earthed, not located
near water connections, is within 1.4 meters of the boiler location protected by RCD and permanently
accessible.
Now you have completed the preparation stage of the installation, complete this checklist as an aid to
yourself and your customer, complete or circle the appropriate answers below, if any questions are
answered as "no" then you must rectify this before commencing the installation.
PROBOIL.4E user & installation guide v1d