Installation & Maintenance Manual: BSBAC 1 HP
Snub Rollers
Belt
Drive Pulley
Take-up Pulley
Figure 12: Belt routing - BSBAC 1 HP drive - section view
Figure 13: Belt routing - BSBAC 1 HP tail - section view
Figure 14: Belt routing - BSBAC 1 HP tail with noseover - section view
6. Splice the ends of the belt by installing the provided splice pin. Figure 15 illustrates the splice pin
installation. The splice pin comes in a pre-cut length that's longer than the width of the belt.
Ensure that the excess length of the pin on either side is bent in towards the upstream of the
conveyor to avoid any catch points on the lacing.
22
Published January 2022
Rev. B