kozy heat CALLAWAY 40 Installation And Operation Manual page 26

Direct vent gas fireplace
Table of Contents

Advertisement

3.8.1.1 Single Opening Vented Cavity Option
Alternative Installations (cont.)
Figure 3.17 shows the installation of crown molding or similar
trim work that goes up to the edge of the air discharge opening.
12" (305mm) is the maximum length of the molding or trim
projection and you must maintain 3" (76mm) clearance for the
full length of crown molding/trim projection. This molding or
trim cannot decrease the minimum opening requirement.
Figure 3.17, Single Opening Vented Cavity with Crown Molding
26 FRAMING
FRONT VIEW
Air discharge opening
(3" x 43") minimum
SIDE VIEW
12" (305mm)
MAX
3" (76mm)
MIN
Enclosure
*must maintain 3" clearance for full
length of crown molding/trim projection
Hussong Mfg. Co., Inc. • Kozy Heat Fireplaces
Ceiling
74"
(1880mm)
MIN
SINGLE OPENING VENTED CAVITY INSTALLATION
#CLW-40 R.3 November 2021

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clw-40

Table of Contents