Group 10 Swing Device; Removal And Installation Of Swing Device - Hitachi ZX200-5G Workshop Manual

Hydraulic excavator
Table of Contents

Advertisement

Removal and Installation of Swing Device

IMPORTANT: Cap the open ends in case the hoses
and pipes have been disconnected. In addition,
attach an identification tag onto the connectors,
hoses, and pipes for assembling. Connect the
hoses and install the clips in case the clips which
secure the hoses have been removed.
Removal
1. Set the machine position for inspection and
maintenance. (Refer to W1-6-1.)
d
CAUTION: Bleed air from the hydraulic oil tank.
(Refer to W1-4-1.)
2. Open engine cover (1).
3. Remove bolts, washers (2) (5 used). Remove cover
(3).
j : 17 mm
SECTION 3 UPPERSTRUCTURE

Group 10 Swing Device

1
W3-10-1-1
3
2
WDCD-03-06-001

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zx200lc-5gZx210h-5gZx210lch-5gZx210k-5gZx210lck-5g

Table of Contents