25
27
28
Installation
1. Install all removed adapters to pilot valve (29).
2. Install pilot valve (29) and boot (32) with washers
(31) (4 used) and socket bolts (30) (4 used).
l : 6 mm
m : 20 N·m (2 kgf·m, 15 lbf·ft)
3. Connect hoses (28) (6 used).
j : 19 mm
m : 30 N·m (3 kgf·m, 22 lbf·ft)
4. Tighten lock nut (26) and install the lever (27)
assembly.
j : 19 mm, 22 mm
m : 55 N·m (5.5 kgf·m, 40 lbf·ft)
5. Install clip bands (25, 24).
SECTION 3 UPPERSTRUCTURE
Group 11 Pilot Valve
26
WDAA-03-12-023
24
29
W3-11-1-4
30, 31
WDAA-03-12-019
32