Hitachi ZX200-5G Workshop Manual page 375

Hydraulic excavator
Table of Contents

Advertisement

4, 5
5. Install swing bearing (1) with spring washers (5) (36
used) and bolts (4) (36 used).
j : 30 mm
m : 500 N·m (50 kgf·m, 370 lbf·ft)
6. After installing swing bearing (1), add grease
(Alvania EP2 or equivalent) to grease bath (6) until
pinion (7) of the swing device is 5 mm (0.2 in) under
grease.
f
NOTE: Grease amount: 17 L (4.49 US gal)
SECTION 4 UNDERCARRIAGE
Group 1 Swing Bearing
1
WDAA-04-01-001
W4-1-1-3
a
b
a-
Swing Bearing
b-
Grease Level
7
5mm
6
W175-03-01-002

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zx200lc-5gZx210h-5gZx210lch-5gZx210k-5gZx210lck-5g

Table of Contents