4. Install stopper (11) with spring washers (10) (2 used)
and bolts (9) (2 used).
j : 22 mm
m : 140 N·m (14 kgf·m, 103 lbf·ft)
5. Connect hose (8).
j : 17 mm
m : 25 N·m (2.5 kgf·m, 18 lbf·ft)
6. Connect hose (7).
j : 27 mm
m : 80 N·m (8 kgf·m, 59 lbf·ft)
7. Connect hoses (6) (4 used).
j : 36 mm
m : 180 N·m (18 kgf·m, 133 lbf·ft)
SECTION 3 UPPERSTRUCTURE
Group 3 Main Frame
W3-3-1-5
WDAA-03-03-005