Download Print this page

Heartland VALUE CLASSIC Assembly Manual page 74

Advertisement

PARTS REQUIRED:
x1
OO
TEMPORARY SUPPORT
69" (175,3 cm) Door Stiffener
Install OO flush under panels.
2
Secure to floor frame with (2) 3" screws (Fig. A) .
Mark center of door opening.
Fig. A
Center doors on mark (Fig. B).
3
Screw hinge boards into wall supports with (10) 3" screws, as shown.
4
Make sure screws go into framing .
Fig. B
3/8"
(1 cm)
Remove temporary supports and check to make sure doors open and close properly.
FINISH
Your doors are now installed.
Flush
against wall panels
OO
Center 3/8" measurement
on mark.
DOORS
x12
72
3" (7,6 cm)
(2) 3" (7,6 cm) Screws
OO
TEMPORARY SUPPORT
(5) 3" (7,6 cm)
Screws
in door stud

Advertisement

loading

This manual is also suitable for:

16991