Download Print this page

Heartland VALUE CLASSIC Assembly Manual page 41

Advertisement

PARTS REQUIRED
x1
Temporary Brace
TJ
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
x41
2" (5,1 cm)
BEGIN
1
Place 1st 18' eave wall centered on floor.
The 1-1/2" (3,8 cm) overlap is to the top.
Use TJ as a temporary brace as shown.
Secure TJ with (2) 3" screws.
Secure wall with (1) 2" screw into 10' wall
bottom plate (Fig. A) and top plate (Fig. B).
Secure wall to bottom plate first.
ENSURE PANEL CORNERS ARE FLUSH.
2
Nail lower edge of panels to floor
with 2" nails spaced 6" apart.
Angle nails into floor frame
(Fig. C).
Nail panel to 10' wall stud with
1-1/2" nails spaced 6" apart.
3
Secure wall top plate with (1) 3" screw
at the corner at an angle as shown
(Fig. D).
FINISH
Your 1st 18' eave wall is now installed.
18' EAVE WALL INSTALLATION
x3
3" (7,6 cm)
x18
Flush
2" (5,1 cm)
Screw
6" (15,2 cm)
1-1/2" (3,8 cm)
Nails
3" (7,6 cm)
Nails
Nail 2" nails first.
2" (5,1 cm)
Nails
Fig. C
3" (7,6 cm)
Fig. B
Fig. A
3" (7,6 cm)
Screw
Fig. D
3" (7,6 cm)
Nails
(15,2 cm)
39
x2
2" (5,1 cm)
x13
1-1/2" (3,8 cm)
2" (5,1 cm)
Screw
TJ
6"
2" (5,1 cm)
Nails
3" (7,6 cm)
Screws

Advertisement

loading

This manual is also suitable for:

16991