PARTS REQUIRED:
x32
2" (5,1 cm)
x13
1-1/2" (3,8 cm)
3
Nail lower edge of wall panels to floor frame
with 2" nails spaced 6" apart.
Angle nails into floor frame (Fig. C).
Secure wall bottom plates to floor
with 3" nails (Fig. C).
4
Nail 10' wall panel to 10' wall stud with
1-1/2" nails spaced 6" apart.
5
Secure gable wall top plate with (1) 3" screw
at the corner at an angle as shown (Fig. D).
FINISH
Your 2nd 14' wall is now installed.
14' EAVE WALL INSTALLATION
6"
(15,2 cm)
3" (7,6 cm)
Nails
2" (5,1 cm)
Nails
Nail 2" nails first.
Fig. C
35
x14
x1
3" (7,6 cm)
3" (7,6 cm)
Nails
3" (7,6 cm)
Screw
1-1/2" (3,8 cm)
Nails
3" (7,6 cm)
Fig. D
6" (15,2 cm)